top of page

Our projects

A selection of our completed and ongoing projects

Here you will find a selection of our completed and ongoing projects. Unfortunately, we cannot provide much information about some projects as they are classified by authorities and Swedish law as Protected Objects or military interest.

Are you ready to get started?

Contact us to learn more about our products and how we can help you!

Stronglite Logo Symbol

Strong, Light & More Durable than Steel

Our policies

Privacy Policy

Cookie Policy

© 2025 by StrongLite AB

StrongLite has supplied GRP grating in the Micro version and a large number of pre-cut beams to the marina in Limhamn. The material was used by the marina's installers to clad the entire pier.

GRP pier for Sweden's largest marina

StrongLite has supplied GRP grating in the Micro version and a large number of pre-cut beams to the marina in Limhamn. The material was used by the marina's installers to clad the entire pier.
For a customer in Borlänge, StrongLite has manufactured and installed a 60-meter-long work platform over a train sump. The platform is divided into one-meter sections that can be easily lowered individually into the pit under the train. This way, the parts of the pit in front of the train can be kept covered, so that personnel can walk and work there safely.

Foldable work mats for train sump

For a customer in Borlänge, StrongLite has manufactured and installed a 60-meter-long work platform over a train sump. The platform is divided into one-meter sections that can be easily lowered individually into the pit under the train. This way, the parts of the pit in front of the train can be kept covered, so that personnel can walk and work there safely.
Together with Rosenqvist, StrongLite has delivered pre-built escape ramps for installation in the new parts of the Stockholm metro.

Evacuation ramps for the Stockholm metro

Together with Rosenqvist, StrongLite has delivered pre-built escape ramps for installation in the new parts of the Stockholm metro.
StrongLite has delivered a large number of large-sized escape routes to Implenia for the new Varberg train tunnel. The delivery was completed well in advance of the opening. In this tunnel too, the Swedish Transport Administration chose our VARIO plus system, which enables very fast installation and reduces the need for traffic closures.

VARIO plus in Varberg's new train tunnel

StrongLite has delivered a large number of large-sized escape routes to Implenia for the new Varberg train tunnel. The delivery was completed well in advance of the opening. In this tunnel too, the Swedish Transport Administration chose our VARIO plus system, which enables very fast installation and reduces the need for traffic closures.
To protect the overhead line when the bridge is folded up, we have installed a large amount of GRP decking that is attached directly to the rails using our TRV approved VARIO Plus brackets.

VARIO plus on the new Klaffbron in Vänersborg

To protect the overhead line when the bridge is folded up, we have installed a large amount of GRP decking that is attached directly to the rails using our TRV approved VARIO Plus brackets.
For Henriksdal wastewater treatment plant we have delivered and installed stairs and platforms. as well as covering pits. 

A very complicated project where we could not use the help of lifting cranes, but everything had to be lifted into place by hand.

Platforms and stairs to sewage treatment plants

For Henriksdal wastewater treatment plant we have delivered and installed stairs and platforms. as well as covering pits. A very complicated project where we could not use the help of lifting cranes, but everything had to be lifted into place by hand.
To Kungsbacka Municipality and Ölmanäs ARV we have delivered and installed several platforms and stairs. All in GRP. 

To Ölmanäs we qualified both through price. but also with the lowest CO2 emissions with our products in GRP

Platforms and stairs to sewage treatment plants

To Kungsbacka Municipality and Ölmanäs ARV we have delivered and installed several platforms and stairs. All in GRP. To Ölmanäs we qualified both through price. but also with the lowest CO2 emissions with our products in GRP
For a customer in the Gothenburg area, we have solved a problem they had previously with too heavy floorboards in their pits. 
When cleaning and tidying up, these floorboards need to be lifted out and with GRP floorboards the job is considerably easier. 
We mounted the 4 stairs with hinges so that they can be easily folded up for service/cleaning

Stairs and floor for grease pits

For a customer in the Gothenburg area, we have solved a problem they had previously with too heavy floorboards in their pits. When cleaning and tidying up, these floorboards need to be lifted out and with GRP floorboards the job is considerably easier. We mounted the 4 stairs with hinges so that they can be easily folded up for service/cleaning
Our client is a world leading supplier of advanced lifting equipment for the marine industry.

We have supplied gates, ladders and handrails for several projects. The latest project was in the spring of 23 with a new delivery in the fall of 23.

Gates

Our client is a world leading supplier of advanced lifting equipment for the marine industry. We have supplied gates, ladders and handrails for several projects. The latest project was in the spring of 23 with a new delivery in the fall of 23.
Together with AlfaBryggan, Stronglite has delivered Grating to cover a larger platform that will be used to grow seaweed off the Swedish West Coast. This is the first of 5 barges.

Marine farms

Together with AlfaBryggan, Stronglite has delivered Grating to cover a larger platform that will be used to grow seaweed off the Swedish West Coast. This is the first of 5 barges.
Stronglite has supplied a large number of GRP gratings and platforms to several different shipowners and vessels. Our GRP gratings and profiles are an excellent choice for shipping as they require no maintenance and do not rust.

Platforms for Ships

Stronglite has supplied a large number of GRP gratings and platforms to several different shipowners and vessels. Our GRP gratings and profiles are an excellent choice for shipping as they require no maintenance and do not rust.
One of our recurring customers in Gothenburg works a lot in shafts and rocks. The environment there is often humid and not suitable for steel products. For these projects we have supplied cable ladders, floors, profiles and fastening materials in GRP to achieve the customer's requirements for durability!

Cable ladders for mining shafts

One of our recurring customers in Gothenburg works a lot in shafts and rocks. The environment there is often humid and not suitable for steel products. For these projects we have supplied cable ladders, floors, profiles and fastening materials in GRP to achieve the customer's requirements for durability!
For Kristanstad Municipality's new wastewater treatment plant, StrongLite has delivered several platforms, stairs and accesses. These were specially adapted for the assignment and would specifically handle a whole list of chemicals. The customer chose our GRP material as it met all the requirements that the steel or aluminum counterparts could not.

Platforms for Wastewater Treatment Plants

For Kristanstad Municipality's new wastewater treatment plant, StrongLite has delivered several platforms, stairs and accesses. These were specially adapted for the assignment and would specifically handle a whole list of chemicals. The customer chose our GRP material as it met all the requirements that the steel or aluminum counterparts could not.
For a customer we have manufactured several ladders with fall protection. Everything is manufactured according to customer specifications and delivered complete to the installation site.

Ladder with fall protection

For a customer we have manufactured several ladders with fall protection. Everything is manufactured according to customer specifications and delivered complete to the installation site.
Many of our customers do not want cut and finished products, but simply order in bulk. This is of course no problem and we help as much as we can. 

In this delivery the customer chose a GRP floor with conductive properties

Deliveries of materials

Many of our customers do not want cut and finished products, but simply order in bulk. This is of course no problem and we help as much as we can. In this delivery the customer chose a GRP floor with conductive properties
Many of our customers want to save time on installation, but do not have the machines to be able to process GRP. Our material requires a certain type of special tooling to handle multiple cuts and millings. In many cases, we prepare all the material at our place and then send a "lego" to the customer that they can then put together quickly and easily without a lot of custom tools.

We cut, mill and process and then mark it clearly and clearly!

Customized products

Many of our customers want to save time on installation, but do not have the machines to be able to process GRP. Our material requires a certain type of special tooling to handle multiple cuts and millings. In many cases, we prepare all the material at our place and then send a "lego" to the customer that they can then put together quickly and easily without a lot of custom tools. We cut, mill and process and then mark it clearly and clearly!
The Swedish Armed Forces and the Navy have chosen to equip several of their ships with platforms from StrongLite. The reasons are many: Low weight, Radar transparency, customization options and price. Unfortunately, we cannot provide more information and pictures about the projects.

Platforms for the Navy

The Swedish Armed Forces and the Navy have chosen to equip several of their ships with platforms from StrongLite. The reasons are many: Low weight, Radar transparency, customization options and price. Unfortunately, we cannot provide more information and pictures about the projects.
We have supplied several designs and floors to customers for their switchgear installations. Often for 11kV applications. Since our GRP products are non-conductive, the installation is considerably simplified.

Gratings for switchgear

We have supplied several designs and floors to customers for their switchgear installations. Often for 11kV applications. Since our GRP products are non-conductive, the installation is considerably simplified.
For customers, we manufacture gates with multiple functions. Here with double hinges on each gate for larger openings.

Custom gates

For customers, we manufacture gates with multiple functions. Here with double hinges on each gate for larger openings.
A major ice cream manufacturer needed platforms with special dimensions and shapes to be able to access their machines on their new production line. Here are 3 of the 6 ordered platforms ready for delivery. 

They are equipped with Stainless, Acid-resistant wheels to withstand all strong chemicals to keep them clean.

Custom platforms

A major ice cream manufacturer needed platforms with special dimensions and shapes to be able to access their machines on their new production line. Here are 3 of the 6 ordered platforms ready for delivery. They are equipped with Stainless, Acid-resistant wheels to withstand all strong chemicals to keep them clean.
We have delivered several projects where we install our GRP floors at the bottom of these sumps. This creates a very safe working environment completely free from slip hazards.

Floors for train sumps

We have delivered several projects where we install our GRP floors at the bottom of these sumps. This creates a very safe working environment completely free from slip hazards.
Together with Strukton, StrongLite has manufactured and installed 44 crossings in the northern tube of the Öresund Tunnel. The work was carried out in short stages during the summer of 2026 to avoid disrupting traffic. Our VARIO plus brackets enabled rapid installation of the gratings.

The Öresund Tunnel

Together with Strukton, StrongLite has manufactured and installed 44 crossings in the northern tube of the Öresund Tunnel. The work was carried out in short stages during the summer of 2026 to avoid disrupting traffic. Our VARIO plus brackets enabled rapid installation of the gratings.
bottom of page